Monday, June 8, 2009

May 31 2009




I installed the 2 X 10's on the top of the basement walls, drilling holes for all the anchor bolts, and screwing them to the ends of the floor joists. The first logs (sill logs) will also be drilled and be centered on top of these 2 X 10's. We cut down the first 12 trees today. We will haul them to our property tomorrow. (top)
We framed in the mechanical room in the basement. Need to install sheetrock, then we can install the door. (bottom)

No comments:

Post a Comment