Friday, June 22, 2012

Deck Rail Building Completed - June 22, 2012

All the deck railing has been installed. Staining will be the final process in a month or so. Now I will begin on the garage. I have scheduled time with my cousin to transport the lift to our property. On Monday I will pick up the rest of the materials needed to begin laying the sill plates and the sill logs. It's time to break out the big chainsaw to split the sill log in half.





Thursday, June 21, 2012

Railing Progress - June 21, 2012



    This morning I peeled the remaining four rails that I cut last night. I also peeled and stained the last 46 spindles. Once they were dry, I assembled and installed the 13th section of railing. Tomorrow I will complete the last two sections, then I'll start on the garage.

    I'll have to put together a list of what I need to get. I'll need about 110 feet of treated 2 X 8s for the sill plate. The wall logs will rest on them. I'll need more sill seal to go between the sill plate and the 2 foot cement wall. I'll need treaded rod, connector nuts and sill plate washers to bolt down the first round of logs.

    Splitting the first log in half and getting the first round of logs on the wall will be time consuming, then the job should go much faster. Before I know it I'll be back in the mountains cutting more logs!

Railing Progress - June 20. 2012


    On Wednesday I finished the 12th section of railing. I ran out of peeled and stained spindles, and I still needed four rails to finish the last two sections. I decided it was time to head for the mountains and get the rest of the rails. I decided I needed to be more critical when I chose the trees to cut down. One rail was so crooked (I had already peeled it) that I tossed it aside. When I was picking the trees to cut this time, I was just about laying on the ground looking up the trunk to see how straight they were. This worked great. I cut 6 trees and cut them into 10 foot lengths so I came out with 12 good straight rails. I have enough for the loft. Coming out of the mountains was very interesting!


     I saw four bull elk crossing the road in front of me before I had even traveled three quarters of a mile. (It is eight miles of dirt road to get back out) About two miles later I spotted the bull elk in the picture below. He watched me as I sat watching him for a couple of minutes, then he took off up the side of the road. There was another bull with him. About a mile and a half before I hit the tar road again, three cow elk crossed the road in front of me. The ride was better than going through Yellowstone park!!!!


Tuesday, June 19, 2012

Railing Progress - June 19, 2012

    I finished 4 more railing sections. I have enough material to finish 4 more tomorrow, then it's off to the mountains on Thursday. When I walked off the porch this morning there was an antelope about 75 yards north of the house. She just looked at me as I walked to the basement. There was a lot of wind today. I think summer is actually on the way soon!



Monday, June 18, 2012

Railing Progress - June 18, 2012

 
    Today I finished four more sections of railing. I made a few mistakes but overall it went much better than I expected. I am going to try getting all the railing installed this week. That will include a trip into the mountains to get the last three rails, and to Helena to get the last spindles.

    I just returned the weed sprayer to my neighbor, David, and he informed me we are supposed to get snow tonight. If we do, I will post a snow picture tomorrow.