Tomorrow we should be able to start shingling the roof. Installing the facia is taking a lot longer than I thought it would. We also have to install facia on all three dormer roofs.
Wednesday, August 4, 2010
Installing facia, Aug 4, 2010
Today we started installing the facia on the west side and the north side. We also ran the first strip of weather guard on the roof. It has been a bad week to date. We have been rained out two days in a row in the afternoon, and Monday was a late start due to previous commitments my roofer had to take care of.
Tuesday, August 3, 2010
Finished dormers, Aug 3, 2010
On Sunday, my cousin Jim and I trimmed the top wall logs, purlins and ridgepole to length (flush with the outer TGIs) and stained the ends.
Today I picked up the cedar boards for the dormer roofs (1" X 8") and stained all of them. We also picked up the drip edge today. The drip edge is a dark green. Tomorrow we will cut the edges of the roof sheeting flush and install nailers on the end TGIs for the facia, begin installing facia and drip edge.