We started building the dormers today. We have the framework in place. Tomorrow we will build a roof on each dormer, sheet the three roofs, then sheet the dormer exterior walls. Once the dormer walls are sheeted, we will wrap them with Tyvek.
The next step is to install the cedar facia, (Which was finally delivered today) install the valley tin where the house roof meeting the deck roof, install the drip edge, install the felt and weather guard, then get ready to shingle.