Friday, August 24, 2018

June 2018 Basement ceiling


I installed more of the basement ceiling tongue and groove boards. I used up all the 1" X 6" left over from 2017. Hopefully, the rest will be ordered and installed in 2019.

June 2018 grouting master and loft showers



In 2018, I did not spend much time in Montana due to medical issues. I finished grouting the Master shower (above), and the Loft shower (below). I also installed the faucets and shower heads in both. Next year I will install the shower doors.