I installed more of the basement ceiling tongue and groove boards. I used up all the 1" X 6" left over from 2017. Hopefully, the rest will be ordered and installed in 2019.
It’s now 2019 and I have returned home to St Louis. It was a productive summer. I feel I will finish all the building in 2020. I’ll also need to do some normal maintenance on the exterior next summer. It has been a challenge, but I look forward to seeing everything completed.
No comments:
Post a Comment