In 2018, I did not spend much time in Montana due to medical issues. I finished grouting the Master shower (above), and the Loft shower (below). I also installed the faucets and shower heads in both. Next year I will install the shower doors.
It’s now 2019 and I have returned home to St Louis. It was a productive summer. I feel I will finish all the building in 2020. I’ll also need to do some normal maintenance on the exterior next summer. It has been a challenge, but I look forward to seeing everything completed.