Take care, Doug Anderson
Wednesday, October 14, 2009
Work complete for 2009 October 9, 2009
I have wrapped up the log building for 2009 and I am returning to New Hampshire. I ran 6 inch treated posts down the center of the floor, and laid reinforced plastic on both sides. The plastic is secured to the posts and the interior log walls with 2 inch wide wood laths, and the plastic goes out each door forming a trough. The water can get to 1 and a half inches deep on the floor, then it will flow out the doors onto the ground. If the weather warms up to 45 degrees again this fall, Tony will be back to continue sealing the logs and the rest of the deck. I am now signing off on this Blog until at least the middle of May, 2010.
Subscribe to:
Posts (Atom)