The wind was blowing so hard today from the south that my cap kept blowing off my head. Tony was staining the ridgepole and had to stop because of the wind.
Saturday, August 21, 2010
Framing 75% complete, Aug 21, 2010
Thursday, August 19, 2010
Framing end gables, Aug 19, 2010
Yesterday I also installed the last two beams in the basement. They support the logs that run from the main floor all the way to the roof system.
Wednesday, August 18, 2010
Finished shingling, Aug 18, 2010
Framing the end gables requires two people as we will do a lot of it using the lift.