Yesterday I had to purchase a roofing nailer and a 100 foot air hose to finish shingling the roof. I made it to within 3 feet of the peak yesterday before the shingles became too hot to walk on safely. Today I finished shingling the house. I am now looking for someone to help me frame out the end gables.
Framing the end gables requires two people as we will do a lot of it using the lift.
It’s now 2019 and I have returned home to St Louis. It was a productive summer. I feel I will finish all the building in 2020. I’ll also need to do some normal maintenance on the exterior next summer. It has been a challenge, but I look forward to seeing everything completed.
No comments:
Post a Comment