Tuesday, September 13, 2011

East side drain system completed September 13, 2011

The top picture shows the drain/culvert on the east side of the house. Before we installed the drain system on the west side of the house, all water from the west side traveled across the front of the basement and went down the east drain. I put a 90 degree elbow on the end of the pipe you see here, and I cut a hole in the bottom of the drain box for the other end of the elbow to go through. The top is a 20 inch round grate that is rated for 1,000 pounds.

It took about 12 wheel barrow's full of dirt to fill the hole. I then put plastic over the box and cut out a hole in the center, then raked the rock over everything. No more tripping hazard and there should be a lot less soil erosion.

Here is what it now looks like from the edge of the basement apron. I wish we would get a huge rain so I can see the system at work.

Monday, September 12, 2011

All siding completed September 12, 2011

Today I finished siding the basement. I had help from Tony putting up the 16 foot boards. Tomorrow I will caulk the seams on the siding I installed today.

I also installed blinds on the 4 gable windows. I am still looking for blinds for the dormer windows. Butte doesn't seem to have any in stock!

Tomorrow I will go pick up the pipe I need to complete the drain system on the east side of the house. I will take before and after pictures to show what I do.

I also plan to install an outdoor outlet by the basement door tomorrow.