Monday, June 8, 2009

Finish work on basement floor, May 11 2009


Here is Steve using a motorized tool to finish the surface of the floor in the afternoon of the day we poured it. You can see the mechanical room area in the rear, right hand side of the basement. The in-floor heating manifolds are mounted on the wall. The white pipes in front of the in-floor heat manifolds are for the basement bathroom, pipes that will go to the main floor bathroom, and the vent pipes that will extend up through the roof.

No comments:

Post a Comment