Monday, June 8, 2009

Main floor decking completed, May 18 2009


We finished decking the basement today. The only thing left to do is install the 2" X 10" green board around the perimeter, on top of the cement walls. The next step is cut some logs.
We dug the trenches and buried the electrical cables to the house from the meter, and to the garage from the meter.

No comments:

Post a Comment