May 28, 2015 Finished stairway supports in basement
Today I finished the support structure for the main floor stairs. Last year I had two supports in the middle of the basement landing. The four uprights allowed me to properly install the two steps on each side of the landing.
It’s now 2019 and I have returned home to St Louis. It was a productive summer. I feel I will finish all the building in 2020. I’ll also need to do some normal maintenance on the exterior next summer. It has been a challenge, but I look forward to seeing everything completed.
No comments:
Post a Comment