This is the garage loft ceiling insulated with the R38 batting. Below, I installed the rest of the 1" by 8" ceiling boards I had left over from the house. I will finish the ceiling when the house is completed.
It’s now 2019 and I have returned home to St Louis. It was a productive summer. I feel I will finish all the building in 2020. I’ll also need to do some normal maintenance on the exterior next summer. It has been a challenge, but I look forward to seeing everything completed.
No comments:
Post a Comment