Today I finished wiring all the loft circuits into the 100 Amp panel in the loft bedroom closet. This included running one 2 - 2 - 2 - 4 cable from this panel to the main panel in the basement. I no longer have to run extension cords all over the loft while I am working.
It’s now 2019 and I have returned home to St Louis. It was a productive summer. I feel I will finish all the building in 2020. I’ll also need to do some normal maintenance on the exterior next summer. It has been a challenge, but I look forward to seeing everything completed.
No comments:
Post a Comment