This is the sheet rocked both end gable in the loft.
Above is one of the dormer walls with sheetrock completed. Below is one loft end gable in the garage with the sheetrock completed. I will not tape the garage, or paint it until the house is completed. At this point, all sheetrock has been installed and taped, ready to paint. Now I am flying back to Missouri to spend the 4th of July with my family.
No comments:
Post a Comment