Monday, September 2, 2019

August 2019 Loft and stair railing Garage

We finished installing the railings in the loft and down the stairs in the garage.


All that is left is to do is fill some nail holes, do some light sanding and clear coat the railings. 

July 2019 Finished rest of floor on main level

We finished installing the rest of the flooring on the main floor. There is in floor heating under the flooring in the master bedroom with its own thermostat. There is also in floor heating in the family room and the kitchen, each with its own thermostat. You will also notice I installed the last two steps off the landing to the main floor above.
Here is the kitchen area. I had the cabinet people in to measure for the kitchen cabinets and island. I have to build a flat sheet rock wall, seven feet high on the north wall to facilitate the cabinet installation. I will also install electrical outlets in the wall I build.

July 2019 Vanities installed in bathrooms

Half bath with vanity installed
Loft bath with hanging vanity
Master bath vanity

June 2019 Shower doors

Master bath shower dor installed


Loft shower door installed

June 2019 In floor heating and tile



 Here is the loft bathroom with the in floor heating and tile installed.


Master Bath


Half bath and mud room on main floor  

Friday, August 24, 2018

June 2018 Basement ceiling


I installed more of the basement ceiling tongue and groove boards. I used up all the 1" X 6" left over from 2017. Hopefully, the rest will be ordered and installed in 2019.

June 2018 grouting master and loft showers



In 2018, I did not spend much time in Montana due to medical issues. I finished grouting the Master shower (above), and the Loft shower (below). I also installed the faucets and shower heads in both. Next year I will install the shower doors.