Monday, September 2, 2019

July 2019 Finished rest of floor on main level

We finished installing the rest of the flooring on the main floor. There is in floor heating under the flooring in the master bedroom with its own thermostat. There is also in floor heating in the family room and the kitchen, each with its own thermostat. You will also notice I installed the last two steps off the landing to the main floor above.
Here is the kitchen area. I had the cabinet people in to measure for the kitchen cabinets and island. I have to build a flat sheet rock wall, seven feet high on the north wall to facilitate the cabinet installation. I will also install electrical outlets in the wall I build.

No comments:

Post a Comment