Monday, September 2, 2019

August 2019 Garage ceiling and end gables

I finished installing the ceiling boards this month. I also replaced the long tube florescent lights with angled cans inset into the ceiling with LED lights.
As you can see, all windows are now trimmed out, and all trim around the end gables is complete.  The garage windows on the main floor have been trimmed out and finished with a clear coat. I have also installed shades in all nine garage windows.

No comments:

Post a Comment