Monday, September 2, 2019

August 2019 Main floor doors and trim

All four interior doors on the main floor have been installed.
The master bedroom closet clothes racks have been installed.
All baseboard trim and the trim around the ceiling on the main floor is complete. 

No comments:

Post a Comment