Saturday, August 12, 2017

2017 Wiring, Shower stalls



   At this point, I have completed the running of all of the electrical wiring on the main floor and the loft bathroom. The switches and outlets will be completed after the sheetrock is installed. The above is the master shower/tub area. I installed the first layer of cement for the shower floor pans, pre-sloping the floors towards the drain about 1/2 inch per foot. The next day I installed the rubber floor membranes with the help of a friend, Rich Dube, over the floor, going up the walls about 6 inches. I then installed the cement board on the walls and sealed all seams with construction adhesive.

   Once the walls were installed, I installed the final layer of cement to the shower pans, maintaining the 1/2 inch per foot slope.


   This is the loft shower. Both shower areas have built-in shelves for shampoo, soap, etc. The only thing left to do is paint both shower areas with RedGard waterproofing, then they will both be ready for tiles.