2017 Planning and building walls



The first project in the house was planning out the walls for the master bedroom, bathroom, and half bath on the main floor. I laid out boards on the floor to get the feel of the dimensions of the rooms and hallways before I started building the walls. I also planned the area for the washer and dryer and the kitchen stove, and installed electrical boxes and the water/waste box for the washing machine.


I planned out the master bath shower/tub area so the shower is in the front and the bath tub is at the rear of the area. I was hesitant to complete the shower pans because I had never done one.



This is the half bath on the main floor. Once all the walls were up, I installed all the outlet boxes for electrical outlets, switches, smoke detectors and thermostats. The wiring would not be started until all the plumbing drains, vents and water lines are installed.