Monday, September 2, 2019

July 2019 Vanities installed in bathrooms

Half bath with vanity installed
Loft bath with hanging vanity
Master bath vanity

June 2019 Shower doors

Master bath shower dor installed


Loft shower door installed

June 2019 In floor heating and tile



 Here is the loft bathroom with the in floor heating and tile installed.


Master Bath


Half bath and mud room on main floor  

Friday, August 24, 2018

June 2018 Basement ceiling


I installed more of the basement ceiling tongue and groove boards. I used up all the 1" X 6" left over from 2017. Hopefully, the rest will be ordered and installed in 2019.

June 2018 grouting master and loft showers



In 2018, I did not spend much time in Montana due to medical issues. I finished grouting the Master shower (above), and the Loft shower (below). I also installed the faucets and shower heads in both. Next year I will install the shower doors.


Friday, September 22, 2017

August 2017 Loft Bathroom


The loft bathroom tiles are also installed. As noted in the previous post, it has not been grouted yet.


I did a different border in the loft bathroom from what I did in the master bathroom.





I lowered the ceiling at the rear of the loft bathroom so moist air escapes towards the exhaust fan easier. These ceiling boards were coated on all sides with clear coat. I also coated the logs in the ceiling with an oil based clear coat to protect from moisture.
                             
                                                          This is the last post for 2017.

August 2017 Master Bathroom Tile


I tiled the floor and the walls in the Master Bathroom. I did not grout the tile because my well pump failed. Grouting the tile in the Master Bathroom and the Loft Bathroom will be one of my first two projects in 2018, once I've installed my new well pump.


I placed the water valve for the tub on the side for easy access for anyone in the tub.