Today I finished installing the remaining windows. The wind was fairly strong today which made it more of a challenge. Yesterday I took a trip to Bozemen to get shower/bathroom components I could not find in Butte. The next project will be installing the shower fan/light and the overhead light in the bathroom. Then I will finish plumbing in the shower and get ready to tile.
Showing posts with label Windows installed. Show all posts
Showing posts with label Windows installed. Show all posts
Saturday, June 18, 2011
Monday, August 30, 2010
Finished installing windows available, Aug 30, 2010
Today I finished installing all the windows I have purchased so far. There are 4 windows in the loft and 2 windows on the main floor that are not available at this time. These are the windows on the west side of the house in the family room. Below are the windows on the North side of the house. I am in the process of framing in the center window. I will sheet it over with OSB for the winter. When I get the window next year, I can install it very quickly. I will finish this window tomorrow. There is one other window I will frame out and sheet over tomorrow.
will do temporary frames on them and sheet them over with OSB for the winter.
I will be spending the next few days wrapping up loose ends. I plan to head home by September 6th at the latest.
Subscribe to:
Posts (Atom)