Monday, August 30, 2010

Finished installing windows available, Aug 30, 2010


Today I finished installing all the windows I have purchased so far. There are 4 windows in the loft and 2 windows on the main floor that are not available at this time. These are the windows on the west side of the house in the family room. Below are the windows on the North side of the house. I am in the process of framing in the center window. I will sheet it over with OSB for the winter. When I get the window next year, I can install it very quickly. I will finish this window tomorrow. There is one other window I will frame out and sheet over tomorrow.




There are 4 doors on the main floor, 2 double doors and 2 single doors. I have installed one of the single doors. Since I do not have the other doors at this time, I
will do temporary frames on them and sheet them over with OSB for the winter.

I will be spending the next few days wrapping up loose ends. I plan to head home by September 6th at the latest.

No comments:

Post a Comment