Friday, August 27, 2010
View of loft from the main floor, Aug 27, 2010
Here are pictures of the loft from the main floor. The top picture is the north end, the bottom the south end. As you can see, all of the logs for the roof system have been stained completely. Here you can see the four windows that were framed in and sheeted over. When I get the windows next year, I will use a router to remove the OSB covering the window openings and install the windows.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment