This was my final project for 2019. I had to scribe in 2x6 and 2x4 studs, 16 inches on center to make a flat wall seven feet high in order to mount the kitchen cabinets. I sheeted the wall over with 1/2” sheet rock, after installing outlets, and plumbing the water line for the refrigerator. I’m having the cabinets built in Gold Creek Montana. They will be installed in November. I will have countertops installed next year.
Friday, September 13, 2019
Monday, September 2, 2019
August 2019 Main floor doors and trim
August 2019 Basement stairs
Here are the completed stair rails going to the basement. |
Again, all that is left is to fill nail holes, light sand and clear coat. |
August 2019 Loft and stair railings in house
This week I installed the railings around the loft of the house and down to the main floor. |
I had to purchase a special laser guided drill to get the proper angles on the stair railings and spindles. All the posts for the railings were cut in the mountains above Butte, and hand peeled. |
August 2019 Garage ceiling and end gables
I finished installing the ceiling boards this month. I also replaced the long tube florescent lights with angled cans inset into the ceiling with LED lights. |
August 2019 Loft and stair railing Garage
July 2019 Finished rest of floor on main level
We finished installing the rest of the flooring on the main floor. There is in floor heating under the flooring in the master bedroom with its own thermostat. There is also in floor heating in the family room and the kitchen, each with its own thermostat. You will also notice I installed the last two steps off the landing to the main floor above. |
June 2019 In floor heating and tile
Here is the loft bathroom with the in floor heating and tile installed.
Master Bath
Half bath and mud room on main floor