Today I started building the first section of deck rail. I built a template out of a 2X4 so the spindle holes would all be drilled on the same plane and evenly spaced. I hand peeled and stained about 45 spindles today. (Only 220 to go!) The first section took 16. I stained the bottom and about a foot up on all 30 posts.


Here is the first completed rail section. I drilled two 3/8" holes on each post, and using an electric impact wrench installed 4 - 3/8" X 8" lag bolts with fender washers. They are installed towards the outside of the rail. Tomorrow I will hand peel and stain the rest of the spindles. I had planned to build the sections on the garage slab. The first one was completed on the deck and it seems to be the best way to do it. I will finish staining the rest of the posts and the rails once all the sections are in place.