Wednesday, June 15, 2011

Framing shower and bathroom June 15, 2011




Today I finished framing in the shower and the bathroom. The floor of the shower has been sloped to the drain with cement, Tomorrow I'll install the membrane over the shower floor, secure it at the drain, and cover it with 1 inch of mason cement. When this is completed, I can install the hardiboard on the walls and bench and get set to install tiles.






No comments:

Post a Comment