The east side of the house now has felt installed up to the bottom of the dormers. All valley metal has been installed where the deck roof meets the upper roof on both sides, and above the dormers. Once the felt is installed on the east side to the peak, we can install the rest of the drip edge and begin shingling.
My plan is to have the roof completely shingled by the end of this week so we can begin framing in the end gables next week.
No comments:
Post a Comment