All facia and drip edge has been installed. We were rained out again today at 3:00 PM. It feels like Florida where it would rain every afternoon.
Here is the east side of the house. The facia and drip edges are completed on the dormers, and the entire roof is dried in. We started shingling on this side this afternoon. The plan for the next two days is to complete the shingling on the entire roof. The next step is to frame in the end gables.
Once the end gables are framed in, we can install the soffits on both ends of the house and over the deck on both sides.
No comments:
Post a Comment