As I was putting down the decking today I realized I was going to run out of deck screws again. I will need to purchase at least 8 more pounds of screws in the morning if I want to complete the decking tomorrow.
The front deck is coming along very well. Once we are done with the decking, I will install the light cans over the deck and then install the soffits over the deck on both sides.
I should have enough tongue and groove (T&G) boards to complete the soffits. About a third of the T&G I have on hand have been stained and are ready to be installed. Other than a slight problem with the east side TGI's, the soffits should go very fast.
I still have not made up my mind on the color of the siding for the end gables and the dormers. Help!