The loft main floor is completed. I installed the Hand Scraped Maple Saddle that matches what I installed in both loft bedrooms. I now have to install hand rails in the loft and on the stairway.
Wednesday, August 3, 2016
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment