Wednesday, August 3, 2016

June 2016 Loft Floor Completed


The loft main floor is completed. I installed the Hand Scraped Maple Saddle that matches what I installed in both loft bedrooms. I now have to install hand rails in the loft and on the stairway. 




No comments:

Post a Comment