On August 30th, I finished the stairway to the loft as far as I could go. The last four steps (Log stringers and treads) have been completed. They will not be installed until the hardwood floor is installed on the main floor. All the screws on the platform, stringers and treads were countersunk and sealed with wooden plus, then sanded smooth. All of these steps will be stained a true cedar to match the rest of the logs on the main floor. The two lowest steps you see are temporary steps made from 2 X 12's that will be removed when the permanent ones are installed.