Wednesday, July 31, 2013
July 30, 2013 Ridge pole and perlins installed
Today we finished notching all the posts for the roof system. We installed the posts, perlins and ridgepole, and cut the flats on the top two side wall logs.We install a lot of braces going three or four directions to make sure the posts do not move when we install the perlins and ridge pole. Most of the logs have been stained. The rest of the staining should be completed by the 1st of August. It's really starting to look like a building.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment