September, 2020 - Finishing Touches


This will be the final entry on this Blog. The house and garage are now completed. I took this picture on one of the last nights I was there this year. I turned on as many lights as I could to see what it looked like at night.

In the last few days, I had some stone brought in, and some road mix. The stone was spread out around the perimeter of the house over some existing stone that had spread out some in the last 9 years. The road mix was spread around the garage, in front of the house, and on the circular driveway around the house.

This year I completely satined or clear coated the entire exteriors of the house and the garage, as well as the handrails on the house deck. This included all exterior window and door trim. Prior to staining, all logs and joints were checked for cracks and caulked accordingly. 

I want to thank my wife, Betsy Freedland for putting up with me the last 12 building seasons. I may have been in Montana working hard on this project, but she was at home alone taking care of everything there on her own. This included a move from New Hampshire to St Louis.

I also want to thank my cousin, Jim Hendrickson of High Country Concrete, for all the help, advice, council, etc. during the entire building process. Without his help, I would still be building, possibly for years to come.

People ask me, "How many of these homes have you built?" I say one and done!

 

September, 2020 - Kitchen Countertops & Sink

 


The countertops are finally installed. You can see on this picture the GFI outlet in the island.


The sink is a 60/40 stainless steel. I installed Kohler stainless steel drain in each one. The faucet is a brushed nickel from Kenyon Nobel in Bozeman. The dishwasher drain is plumbed into the right sink.


The island countertop extends off the right side shown here by 12 inches.


September, 2020 - Kitchen & Master Bedroom Ceiling Lighting


Today I installed the lighting in the ceiling of the master bedroom.


Once the kitchen cabinets were installed I installed the track lighting in the kitchen above and the dining area below. All the lights are dimmable LEDs. The kitchen and dining area lights operate off separate dimmer switches.


 

September, 2020 - Basement Window/Door Trim, Kitchen Window Trim


I finished trimming out the basement windows and door on the daylight side. I then installed the baseboard trim.



I had originally trimmed out the two windows in the kitchen in 2018 or so. When I decided to install a flat, studded, sheetrock wall, to make installing the kitchen cabinets easier, I ripped out the the first trim boards. Just before the countertops were installed, I retrimmed the kitchen windows and rehung the shades.








 

September, 2020 - Decking and Kitchen Island Finish


I sanded the entire deck off the main floor with a hand held belt sander. I went through about 35 belts in the process. The goal was to flatten any 2 X 6's that were  cupped, and remove all of the original finish.


We then stained the entire deck with a solid stain from Sherwin Williams. The deck, and the stairs going onto the deck is close to 1,400 square feet of surface.


The cabinet people delivered the panel and two end caps for the back of the Kitchen Island. I installed them the next day. The back panel was one piece.

 

August, 2020 - Island Plumbing/Electrical Wall




When I started the 2 X 6 wall behind the kitchen island, the drain and vent pipes, the power wire, and the hot and cold water lines were all coming through the floor at the corner of the island.


I installed three outlets in the island. One is on the outside end of the island where everything came out of the floor. This has the GFI that controls the other two outlets. One interior outlet is for the built-in microwave, the other is for the dishwasher. The hot water line has a T behind the sink area with a separate line going directly behind the dishwasher. There is also a coax cable coiled behind the microwave in case anyone should want to use it in the future. It runs to the mechanical room.




August, 2020 - Kitchen Cabinets


The kitchen cabinets were installed this month.