Showing posts with label Basement siding completed. Show all posts
Showing posts with label Basement siding completed. Show all posts

Monday, September 12, 2011

All siding completed September 12, 2011

Today I finished siding the basement. I had help from Tony putting up the 16 foot boards. Tomorrow I will caulk the seams on the siding I installed today.

I also installed blinds on the 4 gable windows. I am still looking for blinds for the dormer windows. Butte doesn't seem to have any in stock!

Tomorrow I will go pick up the pipe I need to complete the drain system on the east side of the house. I will take before and after pictures to show what I do.

I also plan to install an outdoor outlet by the basement door tomorrow.